Dienste des ZIH
Backup Datennetz Exchange Hochleistungsrechnen Internet-Anbindung
Lizenz-Server Login Shibboleth Software-Verteilung

Weitere zentrale Dienste der TUD
FIS SAP Selma WCMS

Informationen zur ausgewählten Ankündigung / Meldung

zurück


Interruption of the power supply Andreas-Schubert-Bau (beendet)
From: 13.02.2019 / 07:00
To: 13.02.2019 / 09:00
Ladies and Gentlemen,

for your information:

On 13.02.2019, from 7 a.m. to approx. 9 a.m., the power supply in the laboratory container of the Andreas Schubert Building, 1st floor and server room, will be interrupted due to installation work.

Please also note:
- During the power cut, the entire electrical system must be regarded as live.
- Within the specified switch-off time, voltage may return several times and be switched off again.
- If systems are operated via EMERGENCY/STOP shutdown, they may have to be switched on again manually.
- The system users must ensure that the function of their technology is fully restored after a voltage recovery.

--
Aktuelle Ankündigungen >
Abgelaufene Ankündigungen >

RSS feed - TUD / ZIH >

::. grafische History .::


Login